400-828-9208

24/7/365

Onsite Service

  • GC-EB1
  • GC-EB2
  • Jiangsu Xianyun Data Center

    • "Transformers" the whole module design mode upgrades stability and reliability.

    • Only 5minutes drive from S234 provincial road ,5 minutes drive from S75 highway,30 minutes drive from Yancheng Airport

    • Number of cabinets: 2120R

    China (Wuxi XDC+) International Data Center

    • Multiple data center clusters, supporting unlimited expansion of business operations

    • Only 3 minutes drive from the New District Railway Station,10 minutes drive from Shuofang Airport ,12 minutes drive from Wuxi Railway Station,15 minutes drive from Wuxi East Railway Station

    • Number of cabinets: 11608R

    GC-EB1 MAIN PARAMETERS

    Whether it is a financial institution with high security requirements or an internet company driving cost-efffectiveness value, our experts team will provide perfect solutions to meet individual needs of different enterprises.

  • standard Uptime Tier Ⅳ
  • Construction method
    Self-build
  • Construction Area
    19350.4㎡
  • Main building height
    22.1m
  • Power supply
    Dual main
  • Electricity scale24MW+24MW
  • UPS mode
    Online/2N
  • Cooling method
    liquid cooling/2N
  • GC-EB2 MAIN PARAMETERS

    Whether it is a financial institution with high security requirements or an internet company driving cost-efffectiveness value, our experts team will provide perfect solutions to meet individual needs of different enterprises

  • standard Uptime Tier Ⅳ
  • Construction method
    Self-build
  • Construction Area
    107256.0㎡
  • Main building height
    23.8m、43m
  • Power supply
    Dual main
  • Electricity scale288MW
    +288MW
  • UPS mode
    Online/2N
  • Cooling method
    liquid cooling/2N
  • GC-EC3 MAIN PARAMETERS

    不论是对安全性要求极高的金融机构,还是追求成本效益的互联网企业,我们的专家团队将以完美解决方案,满足不同企业的个性化需求

  • 数据中心标准Uptime Tier Ⅳ
  • Construction method
    joint-build
  • Construction Area
    40280.0㎡
  • Main building height
    34.5m、36.1m
  • Power supply
    Dual main
  • Electricity scale40MW+40MW
  • UPS mode
    Online/2N
  • Cooling method
    liquid cooling/2N
  • Full system high standard independent 2N configuration

    XDC+ data center pursues " high availability, high stability, high security", while also take into account high efficiency, low PUE, low carbon emissions and green energy saving.

    configuration

    diesel generator

    configuration

    CRAC refrigerator system

    configuration

    Power supply and distribution system

    configuration

    UPS power supply system

    Sitemap | Law | Privacy | Terms of use | Feedback | Technical Support
    Copyright © 2015-2020 XDC+. All Rights Reserved.
    Record No.:苏ICP备16008472号-1